Sr. No |
Circular No. |
Dispatch No |
Subject |
Circular Date |
Size |
Language |
Document |
600 |
Comml AJ-602 |
अविविनिलि/ मु. अ.(वाणिज्य)/ अ.अ.-II/2015-16/प्रे-8839 |
कृषि श्रेणी मे आवेदको से नये कनेक्शन एवं अन्य कार्य |
18-Mar-16 |
363 KB |
Hindi |
Download |
599 |
Comml AJ-601 |
AVVNL/CE(Comml)/XEN(C-II)/F./2015-16/D-6823 |
Clarification regarding provision of Net Metering and Gird Connectivity of Gird Connected rooftop and small solar photovoltaic system |
28-Dec-15 |
403 KB |
English |
Download |
598 |
Comml AJ-600 |
AVVNL/CE(Comml)/XEN(C-II)/F./2015-16/D-6819 |
Delegation of power to take "No appeal decision" against order passed by DJ court and Below , Permanent Lok Adalat, DFCP and SCDRC |
28-Dec-15 |
362 KB |
English |
Download |
597 |
Comml AJ-599 |
AVVNL/CE(Comml)/XEN(C-II)/F./2015-16/D-6765 |
Release of Power connection to new industries without consent to establish (CTE) from RSPCB |
18-Dec-15 |
392 KB |
English |
Download |
596 |
Comml AJ-598 |
AVVNL/CE(Comml)/XEN(C-II)/F./2015-16/D-6249 |
Prescribing norms for electrification of colonics / Housing schemes developed by private Builders/Developers/Housing Societiesand releasing permanent connection there in |
1-Dec-15 |
381 KB |
English |
Download |
595 |
Comml AJ-597 |
AVVNL/CE(Comml)/XEN(C-II)/F./2015-16/D-6192 |
Tariff Payable to grid connected rooftop & small solar Photovoltaic systems under Net Metering Regulation-2015 |
20-Nov-15 |
491 KB |
English |
Download |
594 |
Comml AJ-596 |
AVVNL/CE(Comml)/XEN(C-II)/F. /2015-16/D6028 |
Recovery of Compounding Charges in case of theft of electricity |
10-Nov-15 |
572 KB |
English |
Download |
593 |
Comml AJ-595 |
AVVNL/CE(Comml)/XEN-(C-II)/F/2015/D-5259 |
Amendment in Comml. AJ-540 issued in respect of constitution of Appellate authority |
7-Oct-15 |
308 KB |
English |
Download |
592 |
Comml AJ-594 |
AVVNL/CE(Comml)/XEN-I/F.57(F)/2015-16/D-5247 |
Recovery of fuel surcharge amount for fourth quarter of FY 2014-15 |
6-Oct-15 |
408 KB |
English |
Download |
591 |
Comml AJ-593 |
AVVNL/CE(Comml)/XEN-(C-II)/F/2015/D-5148 |
Amendment in Comml AJ-540 issued in respect of Consititution of appellate authority |
22-Sep-15 |
320 KB |
English |
Download |
590 |
Comml AJ-592 |
AVVNL/CE(Comml)/XEN-(C-II)/F/2015-16/D-4751 |
Laying of Optical Fibre based telecom network cables on existing electric poles (33/KV/11KV/LT) of Discom for 4G communication fixing of rental charges and interest free security deposit |
17-Sep-15 |
750 KB |
English |
Download |
589 |
Comml AJ-591 |
AVVNL/CE(Comml)/XEN-(C-II)/F/2015-16/D-4644 |
Implementation of Provisions of Connectivity and Net Metering for Rooftop and small solar Grid Interactive System under Net Metering Regulation-2015 |
2-Sep-15 |
407 KB |
English |
Download |
588 |
Comml AJ-590 |
AVVNL/CE(Comml)/XEN-(C-II)/F/2015-16/D-4048 |
Clarification regarding provision of Net Metering and Grid Connectivity of Grid Connected Rooftop and Small Solar Photovoltaic System |
24-Jul-15 |
383 KB |
English |
Download |
587 |
Comml AJ-589 |
AVVL/CE(Comml)/XEN-(C-II)/F-/2015-16/D-3578 |
Regarding relaxation of applicability of Supply Voltage |
7-Jul-15 |
314 KB |
English |
Download |
586 |
Comml AJ-588 |
AVVNL/CE(Comml)/XEN-(C-II)/F/2015-16/D-3090 |
Laying of Optical Fibre based telecom network cables on existing electric poles (33/11KV/LT) of Discom for 4G communication, fixing of rental charges and interest free security deposit |
22-Jun-15 |
653 KB |
English |
Download |
585 |
Comml AJ-587 |
AVVL/CE(Comml)/XEN-(C-II)/F-57/2015-16/D-2723 |
The Energy Department Order Agriculture Service |
15-Jun-15 |
443 KB |
English |
Download |
584 |
Comml AJ-586 |
AVVL/CE(Comml)/XEN-(C-II)/F-57/2015-16/D-2722 |
Depositing of defective Energy Meter in store |
15-Jun-15 |
311 KB |
English |
Download |
583 |
Comml AJ-585 |
AVVL/CE(Comml)/XEN-(C-II)/F-/2015-16/D-926 |
Electric connection to inhabitiants of Un-approved Kachi Basties has been examined clause No-4 of terms & Conditions for Supply of electricity -2004 |
26-May-15 |
427 KB |
English |
Download |
582 |
Comml AJ-584 |
AVVL/CE(Comml)/XEN-II/F-/2015-16/D-882 |
Releasing of Single phase Connection to Domestic/ Non Domestic consumers upto 10 KW Connected load |
26-May-15 |
427 KB |
English |
Download |
581 |
Comml AJ-583 |
AVVL/CE(Comml)/XEN-I/F-57(F)/2015-16/D-876 |
Recovery of fuel surcharge amount for third quarter of FY-2014-15 |
25-May-15 |
396 KB |
English |
Download |
580 |
Comml AJ-582 |
AVVL/CE(Comml)/XEN-I/F-57(F)/2015-16/D- |
Ractification of Order No-6977 dt-21-01-2015 (Comml AJ-564), 6978 dt-21-01-2015 (Comml AJ-565) and 7328 dt-18-02-2015(Comml AJ-567) issued by Commercial Wing Regarding recovery of Fuel surcharge |
25-May-15 |
320 KB |
English |
Download |
579 |
Comml AJ-581 |
AVVL/CE(Comml)/XEN-II/F-/2015-16/D-503 |
Depositing of Defective Energy meters in stores |
18-May-15 |
422 KB |
English |
Download |
578 |
Comml AJ-580 |
AVVL/CE(Comml)/XEN-II/F-/2015-16/D-409 |
Detailed Guideline & Procedure for Net Metering and Gird Connectivity of Grid Connected Rooftop & Small Solar Photovoltaic Systems. |
6-May-15 |
6.6 MB |
English |
Download |
577 |
Comml AJ-579 |
AVVNL/CE(COMML)/XEN(C-II)/F./2015-16/D.373 |
Prescribing norms for Electrification of Colonies /Housing Schemes developing by private builders /Developers/Housing Societies and releasing permanent connection there in. |
4-May-15 |
599 KB |
English |
Download |
576 |
Comml AJ-578 |
AVVNL/CE(COMML)/XEN(C-II)/F./2015-16/D373 |
Prescribing norms for Electrification of Colonies /Housing Schemes developing by private builders /Developers/Housing Societies and releasing permanent connection there in. |
4-May-15 |
424 KB |
English |
Download |
575 |
Comml AJ-577 |
AVVL/CE(Comml)/XEN-(C-II)/F-/2015-16/D-73 |
Prescribing norms for electrification of colonies/Housing Scheme developed by Private Builders/Developers/Housing Societies and releasing permanent connection therein. |
15-Apr-15 |
700 KB |
English |
Download |
574 |
Comml. AJ-576 |
NO.AVVNL/CE(COMML)/XEN(C-II)/F./2015/D.38 |
Levy of Electricity Duty on consumption of Self Generated Energy for any purpose in respect of energy generated by captive power generating plants other than D.G.Sets. |
7-Apr-15 |
811 KB |
English |
Download |
573 |
Comml. AJ-575 |
AVVNL./CE(COMML)/XEN(C-II)/F./2015/D.37 |
Testing of the ABT meters of the consumers availing Open Access from Energy exchange bilateral mode |
7-Apr-15 |
384 KB |
English |
Download |
572 |
Comml. AJ-574 |
अ.वि.वि.नि.लि./ मु.अ.(वाणिज्य)/अ.अ.-II/2014-15 /प्रे.8209 |
ओलावृष्टि से प्रभावित कृषकों के लिए 4 माह के बिजली के बिलों के भुगतान की राशि माफ़ करने बाबत |
31-Mar-15 |
383 KB |
Hindi |
Download |
571 |
Comml. AJ-573 |
AVVNL/CE(Comml.)/XEN(C-II)/F./2015/D.8119 |
Amendment in Comml. AJ-540 issued in respect of constitution of Appellate Authority |
25-Mar-15 |
382 KB |
English |
Download |
570 |
Comml AJ-572 |
AVVNL/CE(Comml)/XEN-(C-II)/F-/2014/D-7731 |
Regarding applicability of Tariff on Hostels |
16-Mar-15 |
289 KB |
English |
Download |
569 |
Comml AJ-571 |
AVVL/CE(Comml)/XEN-(C-II)/F-/2014/D-7730 |
Regarding refund of excess cost of meter |
16-Mar-15 |
647 KB |
English |
Download |
568 |
Comml AJ-570 |
AVVL/CE(Comml)/XEN-(C-II)/F/2014/D-7705 |
Allowing exemption for levy of Urban cess to the recognized educational institutions |
13-Mar-15 |
596 KB |
English |
Download |
567 |
Comml AJ-569 |
AVVNL/CE(Comml.)/XEN-(C-II)/F-/2014/D-7704 |
Allowing exemption for levy of Electricity duty, water conservation cess to the recognized educational institutions |
13-Mar-15 |
|
English |
Download |
566 |
Comml. AJ-568 |
AVVNL/CE(Comml.)/XEN-I/F.57(F)/2014-15/D. 7670 Ajmer |
Tariff for supply of electricity-2015 |
9-Mar-15 |
|
English |
Download |
565 |
Comml AJ-567 |
AVVL/CE(Comml)/XEN-I/F-57(F)/2014-15/D-7328 |
Recovery of Fuel surcharge amount |
18-Feb-15 |
694 KB |
English |
Download |
564 |
Comml AJ-566 |
AVVNL/CE (Comml)/XEN-II/F-/2015/D-7039 |
Regarding Obtaining Aadhar Card from all consumers off the Nigam |
30-Jan-15 |
583 KB |
English |
Download |
563 |
Comml AJ-565 |
AVVL/CE(Comml)/XEN-I/F-57(F)/2014-15/D-6978 |
Recovery of Fuel Surcharge amount |
21-Jan-15 |
667 KB |
English |
Download |
562 |
Comml AJ-564 |
AVVL/CE(Comml)/XEN-I/F-57(F)/2014-15/D-6977 |
Recovery of fuel Surcharge amount |
21-Jan-15 |
710 KB |
English |
Download |
561 |
Comml AJ-563 |
AVVNL/CE(Comml)/XEN-II/F-/2014-15/D-6703 |
Corrigendum for Comml AJ-562 Dt-06-01-2015 |
15-Jan-15 |
264 KB |
English |
Download |
560 |
Comml AJ-562 |
AVVNL/CE(Comml)/XEN-(C-II)/F-/2014/D-6654 |
Rajasthan State Ragulatory Commission (Standards of Performance of Distribution Licensee) Regulation -2014 |
6-Jan-15 |
538 KB |
English |
Download |
559 |
Comml AJ-561 |
AVVNL/CE(Comml)/XEN-(C-II)/F-/2014/D-6644 |
Release of single phase connection in rural area to Domestic/Non Domestic consumers upto 10 KW connected load by installing meter along with AMR arrangments |
6-Jan-15 |
434 KB |
English |
Download |
558 |
Comml AJ-560 |
AVVNL/CE(Comml)/XEN-I/F-(57)F/2014-15/D-6587 |
Recovery of fuel surcharge amount |
24-Dec-14 |
353 KB |
English |
Download |
557 |
Comml AJ-559 |
AVVNL/CE(Comml)/XEN(C-II)/F./2014/D-5191 |
Electrification of Private Industrial Area (s) to be developed by the Builders/Developers |
7-Oct-14 |
442 KB |
English |
Download |
556 |
Comml AJ-558 |
अ.वि.वि.नि.लि./मु. अ.(वाणिज्य)/ अ.अ-II/2013-14/प्रे-5190 |
खराब मीटरो को बदलने बाबत |
7-Oct-14 |
286 KB |
Hindi |
Download |
555 |
Comml AJ-557 |
AVVNL/CE(Comml)/XEN(C-II)/F./2014/D-5185 |
Compliance of directions issued by "Rajasthan State Pollution control Board " to disconnect the electric supply of consumer (s) for non compliance of directions issued under section 31(A) |
7-Oct-14 |
477KB |
English |
Download |
554 |
Comml. AJ-556 |
AVVNL/CE(Comml)/XEN(C-II)/F./2014/D-5160 |
Regarding to provide additional metering equipment at the premises of HT supply Consumers for power factor purpose. |
1-Oct-14 |
640 KB |
English |
Download |
553 |
Comml. AJ-555 |
AVVNL/CE(Comml)/XEN(C-II)/F./2014/D-5159 |
Procedure for releasing connections on 33 KV supply vortage |
1-Oct-14 |
615 KB |
English |
Download |
552 |
Comml. AJ-554 |
AVVNL/CE(Comml)/XEN(C-II)/F./2014/D-5158 |
Release of Industrial and Non Domestic Category Connection in case of Voltage Regulation of 11 KV feeder is more than 8% and the system improvement scheme has been sanctioned/ approved. |
1-Oct-14 |
620 KB |
English |
Download |
551 |
Comml AJ-553 |
AVVNL/CE(Comml)/XEN(C-II)/F./2014/D-3830 |
Procedure for depositing defecting meters in stores |
21-Aug-14 |
583 KB |
English |
Download |
550 |
Comml. AJ-552 |
AVVNL/CE(Comml)XEN(C-II)/F./2014/D. 2031 |
Installation of Auto Meter Reading (AMR) system on Mobile Tower connection. |
14-Jul-14 |
228 KB |
English |
Download |
549 |
Comml AJ-551 |
AVVNL/CE(Comml)/XEN-II/F/2014-15/D-1894 |
Releasing of Single phase electric connection to Domestic /Non Domestic consumer up to 10 KW connected load. |
2-Jul-14 |
901 KB |
English |
Download |
548 |
Comml AJ-550 |
AVVL/CE(Comml)/XEN-II/F-/2014-15/D-1412 |
Transfers of electric connections M/s Wireless TT info Service Limited and M/s QUIPPO Infrastructure Limited in the name of M/s VIOM Network Limited |
17-Jun-14 |
342 KB |
English |
Download |
547 |
Comml AJ-549 |
AVVL/CE(Comml)/XEN-I/F-57(F)/2014-15/D-1253 |
Recovery of Fuel charge amount |
2-Jun-14 |
274 KB |
English |
Download |
546 |
Comml AJ-548 |
AVVNL /CE(Comml.) /XEN-II/F- /2014-15/D-1227 |
Regarding Defective ABT meters of open Access Consumers. |
30-May-14 |
461 KB |
English |
Download |
545 |
Comml AJ-547 |
AVVL/CE(Comml)/XEN-IIF-/2014-15/D-735 |
Analyzing the out-put Datas provided by the meter reading agency by M&P wing |
19-May-14 |
574 KB |
English |
Download |
544 |
Comml AJ-546 |
AVVNL/CE(Comml.)/XEN-II/F-/2013-14/D-625 |
Complaints from field / consumers are being received that sanctions for new connections /load extention of LIP connection are delayed due to present procedure of sanctioning the connections. |
9-May-14 |
426 KB |
English |
Download |
543 |
Comml. AJ-545 |
AVVNL/CE(Comml)/XEN-II/F-/2014-2015/d.622 |
Assessment to be made in case of burnt/ stopped/ Stolen and defective meters under domestic category of rural area. |
9-May-14 |
|
English |
Download |
542 |
Comml AJ-544 |
अ.वि.वि.नि.लि./मु.अ..(वाणिज्य)/अ.अ.- II/2013-14 /प्रे-448 |
ओलावृष्टि से प्रभावित कृषको के लिए 4 माह के बिजली के बिलो के भुगतान की राशि माफ करने बाबत । |
23-Apr-14 |
403 KB |
Hindi |
Download |
541 |
Comml AJ-543 |
AVVNL /CE(Comml.) /XEN-II/F- /2013-14/D-10282 |
Applicability of correct tariff on the connection of Govt. School / Hospitals |
31-Mar-14 |
458 KB |
English |
Download |
540 |
Comml AJ-542 |
AVVL/CE(Comml)/XEN-II/F-/2013-14/D-10152 |
Release of large number of connection under NDS category to various mobile tower companies / commercial entities. |
24-Mar-14 |
|
English |
Download |
539 |
Comml AJ-541 |
AVVNL/CE(Comml.)/XEN-II/F/2013-14/D-9689 |
Regarding to issue Demand Notice in case of electrification of Affordable Housing Schemes under affordable housing policy-2009 |
4-Mar-14 |
358 KB |
English |
Download |
538 |
Comml AJ-540 |
AVVL/CE(Comml)/XEN-II/F-/2013-14/D-9076 |
Constitution of Appellate Authority |
4-Feb-14 |
315 KB |
English |
Download |
537 |
Comml AJ-539 |
AVVNL/CE(Comml.) XEN-II/2013-14/D-9067 |
Testing of Meter of the Consumers availing Open Acess from energy Exchange/bilateral mode |
3-Feb-14 |
1.5 MB |
English |
Download |
536 |
Comml AJ-538 |
AVVNL/CE(Comml.) XEN-II/2013/D-8982 |
Procedure of site Testing of Industrial /Non-Domestic Category Consumers |
30-Jan-14 |
384 KB |
English |
Download |
535 |
Comml AJ-537 |
AVVNL/CE(Comml.)/XEN-I/F.57(M)/2013/D-8307 |
Action against a person for unauthorized use of electricity & other offences unsder Sections 126,127,135 to 151 and compounding of offence under section -152 of the electricity Act-2003 |
24-Dec-13 |
171 KB |
English |
Download |
534 |
Comml AJ-536 |
AVVNL/CE(Comml)/XEN-II/2013/D-5626 |
Transfer of electric connections of M/s Bharti Infratel Ventures Ltd. , M/s Idea Celluar Towers Infrastructure Ltd. and M/s M/s Vodafone Infrastructure Ltd. in the name of M/s. Indus Towers Ltd. |
7-Nov-13 |
118 KB |
English |
Download |
533 |
Comml. AJ-535 |
AVVNL/CE(Comml)/XEN-I/F.57(M)/2013/D.5389 |
Order-Testing Charges of 0.2s Accuracy Class ABT Meter. |
22-Oct-13 |
|
English |
Download |
532 |
Comml. AJ-534 |
AVVNL/CE(Comml.)/XEN-II/2013/D.5379 |
Regarding Addendum in norms of Electrification of Colonies/ Housing Schemes developed by private builders/ Developers/ Housing Societies and releasing connections. |
21-Oct-13 |
|
English |
Download |
531 |
Comm AJ-533 |
AVVNL/CE(Comml)/XEN-II/2013/D.5378 |
Regarding levy of Electricity Duty, Water Conservation Cess and Urban Cess on the quantum of assessment for Civil Liability. |
21-Oct-13 |
|
English |
Download |
530 |
Comml AJ-532 |
AVVNL/CE(Comml.)/XEN-IF-57(F)/2013/D-4893 |
Amendments in " Terms & Conditions for supply of Electricity-2004" |
24-Sep-13 |
284 KB |
English |
Download |
529 |
Comml AJ-531 |
अ.वि.वि.नि.लि./मु.अ.(वाणिज्य)/अ.अ-II/2013-14/प्रे-4242 |
100 से कम आबादी वाली ढाणियो मे मुख्य मंत्री सबके लिए विधुत योजना के अंतर्गत घरेलू विधुत क्नेक्शन देने के सम्बन्ध मे |
2-Sep-13 |
286 KB |
Hindi |
Download |
528 |
Comml AJ-530 |
AVVNL/CE(Comml.)/XEN-I/F-57/2013/D-4006 |
Recovery of Fuel Surcharge Amount |
23-Aug-13 |
761 KB |
English |
Download |
527 |
Comml AJ-529 |
AVVNL/CE(Comml.)/XEN-I/F-57/2013/D-2926 |
The testing charges of 0.2s accuracy class ABT (Availability Based Tariff ) Compliant HT Trivector Meter to be tested in NABL ,Accredited HTMT Lab, AVVNL Ajmer |
13-Aug-13 |
69 KB |
English |
Download |
526 |
Comml AJ-528 |
AVVNL/CE(C)/XEN-I/F-57(T)/2013/D-1602 |
Tariff for supply of Electricity -2013 |
10-Jul-13 |
|
English |
Download |
525 |
Comml AJ-527 |
अविविनिलि/मु.अ.(वाणिज्य)/अ.अ-II/2013-14/प्रे-1040 |
100 से कम आबादी वाली ढाणियो मे मुख्यमंत्री सबके लिये विधुत योजना के अंतर्गत घरेलू विधुत देने के सम्बन्ध मे |
25-Jun-13 |
|
Hindi |
Download |
524 |
Comml AJ-526 |
AVVNL/CE(Comml.)/XEN-II/F-/2013/D-761 |
Regarding release of large , medium & small industrial connection in industrial area. |
6-Jun-13 |
|
English |
Download |
523 |
Comml AJ-525 |
अ.वि.वि.नि.ल./मु.अ.(वाणिज्य)/अ.अ-॥/2013-2014/प्रे-568 |
फार्म हाउस के कनेक्शनो को घरेलू सेवा से कृषि सेवा मे परिवर्तन किये जाने के सम्बन्ध मे । |
13-May-13 |
|
Hindi |
Download |
522 |
Comml AJ-524 |
अ.वि.वि.नि.लि./ मु.अ.(वाणिज्य)/अ.अ-II/2013/प्रे-344 |
यूजर चार्जेज /सफाई शुल्क (User Charges ) अधिरोपित / उद्ग्रहित करने के क्रम मे |
29-Apr-13 |
124 KB |
Hindi |
Download |
521 |
Comml AJ-523 |
AVVNL/CE (Comml.)/XEN-I/F.57/D-143 |
The consumptions by the mobile tower and wedding house connections |
9-Apr-13 |
109 KB |
English |
Download |
520 |
Comml AJ-522 |
अ.वि.वि.नि.लि./ मु.अ.(वाणिजय) / अ.अ.-II/ 2012-13 / प्रे-22 |
आबादी क्षेत्र मे कनेक्शन देने बाबत ( कृषि कनेक्शन के अलावा) |
1-Apr-13 |
112 KB |
Hindi |
Download |
519 |
Comml AJ-521 |
अ.वि.वि.नि.लि./मु.अ.(वणिज्य).अ.अ.-॥/2012-13/प्रे.5285 |
विघुत अधिनियम -2003 मे निहित प्रावधानानुसार प्रश्मन राशि (Compounding Charges) एवं वैधानिक दायित्व (Civil Liability ) के लिए ली जाने वाली राशि की गणना कर नोटिस जारी करने का प्रपत्र |
11-Mar-13 |
161 KB |
Hindi |
Download |
518 |
Comml AJ-520 |
अ.वि.वि.नि.लि./ मु.अ(वाणिज्य)/ अ.अ-II /2012-13/ प्रे-5286 |
ओलावृष्टि से प्रभावित कृषको के लिए 4 माह के बिजली के बिलो की भुगतान की राशि माफ करने बाबत |
11-Mar-13 |
80 KB |
Hindi |
Download |
517 |
Comml AJ-519 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012-13/D.5178 |
Extention of time period of "Amnesty Scheme" introdued vide Order No.Comml AJ-510 dt. 14.01.2013 |
4-Mar-13 |
92 KB |
English |
Download |
516 |
Comml AJ-518 |
अ.वि.वि.नि.लि./मु.अ.(वाणिज्य)/अ.अ.-॥/2012-13/प्रे-5177 |
ओलावृष्टि से प्रभावित कृषको के लिए 4 माह के बिजली के बिलो के भुगतान की राशि माफ करने बाबत |
4-Mar-13 |
225 KB |
Hindi |
Download |
515 |
Comml AJ-517 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012-13/D-4999 |
Recovery of Civil Liablity amount as well as compounding charges in case of first offense of theft of Electricity under section 135 of the Electricity Act-2003 |
28-Feb-13 |
260 KB |
English |
Download |
514 |
Comml AJ-516 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4849 |
Procedure for billing of Renewable Energy Generators |
14-Feb-13 |
352 KB |
English |
Download |
513 |
Comml AJ-515 |
AVVNL/CE(Comml.)/XEN-II/F.57(F)/2012-13/D.4828 |
Sharing the Cost of Shifting of lines (HT/LT-O/H Lines). |
11-Feb-13 |
487 KB |
English |
Download |
512 |
Comml AJ-514 |
AVVNL/CE(Comml.)/XEN-II/F.57(F)/2012-13/D.4827 |
Permitting the applicant to provide their own meter/ metering equipment. |
11-Feb-13 |
377 KB |
English |
Download |
511 |
Comml AJ-513 |
AVVNL/CE(Comml.)/XEN-II/F.57(F)/2012-13/D.4826 |
Regarding release of Industrial Connections. |
11-Feb-13 |
407 KB |
English |
Download |
510 |
Comml AJ-512 |
AVVNL/CE(Comml.)/XEN-I/F-57(F)/2012/D.4668/Ajmer |
Regarding Reliable Power Supply to Railways. |
23-Jan-13 |
424 KB |
English |
Download |
509 |
Comml AJ-511 |
AVVNL/CE(Comml.)/XEN-I/F-57(F)/2012/D.4654/Ajmer |
Recovery of Fuel Surcharge amount. |
22-Jan-13 |
403 KB |
English |
Download |
508 |
Comml AJ-510 |
AVVNL/Dy.CE(Comml.)/XEN-II/F-57(F)/2012/D.4616 |
Extension of time period of "Amnesty Scheme" Introduced vide order Comml AJ-502 Dt-08-11-12 |
14-Jan-13 |
710 KB |
English |
Download |
507 |
Comml AJ-509 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4471/Ajmer |
Procedure for installing of main meter, check meter and stand-by meter in respect of Open Access Consumers. |
7-Jan-13 |
619 KB |
English |
Download |
506 |
Comml AJ-508 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4444/Ajmer |
Approval of authorise Director (Power Trading) to execute various Power Purchase Agreements with Power Generators. |
7-Jan-13 |
205 KB |
English |
Download |
505 |
Comml AJ-507 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4149/Ajmer |
Treatment to be given to the Compounding Charges recovered agains theft of energy |
11-Dec-12 |
73 KB |
English |
Download |
504 |
Comml AJ-506 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4150/Ajmer |
Regarding release of industrial and non domestic connections in Non -abadi areas /agriculture land in Rural area |
11-Dec-12 |
66 KB |
English |
Download |
503 |
Comml AJ-505 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4751/Ajmer |
Constitution of Appellate Authority |
11-Dec-12 |
489 KB |
English |
Download |
502 |
Comml AJ-504 |
AVVNL/CE(Comml)/XEN-I/F-(57)T/2012/D-4144 |
Corrigendum (Tariff for supply of Electricity -2012) |
11-Dec-12 |
475 KB |
English |
Download |
501 |
Comml AJ-503 |
AVVNL/CE(Comml.)/XEN-II/F-57(F)/2012/D.4029/Ajmer |
Amnesty Scheme for Central Government , State Government Department and their undertaken |
26-Nov-12 |
924 KB |
English |
Download |