Dholpur Combined Cycle Power Plant

|
The Installed Capacity of Dholpur Combined Cycle Power Station is 330MW.
|
Unit No
|
Capacity(MW)
|
Cost(Rs.Crore)
|
Synchronising Date
|
1
|
GT 110
|
1100
|
29.03.2007
|
2
|
GT 110
|
16.06.2007
|
3
|
ST 110
|
27.12.2007
|
|
|
Location
|
Dholpur Combined Power Station is located in Dholpur City in eastier part of Rajasthan State and is situated above 7Km from District HeadQuarter.
|
|
Environmental Profile
|
Based on Gas This Project is Compatively safe in view of environment & water pollution.70 Meter high stack has been provided to release fuel gases into the atmosphere so as to disperse the emitted matter over a wide spread area.
|
|
Highlights
|
Area
|
143 Bigha
|
Water Requirement
|
20 Cuses from Chambal River
|
Fuel Requirement
|
1.5 MM SC MD gas
|
Fuel Supplier
|
ONGC
|
Fuel Transporter
|
GAIL
|
|
|
Salient Features
|
Particulars
|
2007-08
|
2008-09
|
2009-10
|
2010-11
|
2011-12
|
2012-13
|
2013-14 |
2014-15 |
2015-16 |
2016- 17 |
2017-18 upto Nov-17 |
2017-18 upto Dec-17
|
2018-19(March2019) |
Gross Generation (MU)
|
214.90 |
2288.78 |
2424.74 |
1994.83 |
2254.14 |
11624.30918 |
976.67(LU) |
878.72(LU) |
330.03(LU) |
0.00 |
212.93 |
247.70 |
20.93 |
Plant Load Factor
|
87.53 |
79.17 |
83.88 |
69.01 |
77.76 |
40.21 |
33.79 |
30.40 |
11.39 |
0.00 |
11.02 |
11.37 |
0.72 |
Aux.Power Consumption(%)
|
- |
2.61 |
2.49 |
2.84 |
2.73 |
5.64 |
4.55 |
5.64 |
14.34 |
- |
11.65 |
11.55 |
90.34 |
Gas Consumption(MMBTU)
|
- |
17598464.354 |
18324175.35 |
1512476.12 |
.24 SCM/kwh |
.26 SCM/kwh |
.25SCM/kwh |
.25 SCM/kwh |
.26SCM/kwh |
0.00 |
0.25(SCM/kwh) |
0.25 |
0.296 |
SHR (Kcal/kwh) |
- |
- |
2110 |
2126 |
2152 |
2444 |
2275 |
2245 |
2421 |
0.00 |
2292.72 |
2265.28 |
2725.67 |
Availablity(%) |
- |
- |
93.48 |
82.29 |
94.89 |
49.34 |
46.75 |
45.75 |
66.58 |
100 |
23.89 |
23.55 |
81.95 |
|